Kanyon by Beyond is an elegant, nature-inspired residential development featuring beautifully crafted 1, 2, and 3-bedroom apartments. This project offers a selection of off-plan properties for sale in Dubai Maritime City, blending contemporary design with natural light and greenery to create a serene living experience. The interiors are finished with warm timber, brushed metal, and tactile stone, featuring premium European kitchen appliances and spa-inspired bathrooms.
Kanyon by Beyond Highlights
Developer: Beyond Developments
Unit Types: Apartments
Floors: G + 3P + 47 floors + R
Furnishing: Semi-furnished
Service Charge: 21 AED/sqft
Handover: Q2 2029
Location
Kanyon by Beyond is strategically located in Dubai Maritime City, a dynamic community within Bur Dubai dedicated to the maritime industry. This specialized hub provides a full spectrum of maritime services, shipyards, and educational institutions. Its prime position near Dubai’s key ports and transport networks ensures excellent connectivity to international trade routes, making it a vital link in the global maritime chain. Nearby locations include Downtown Dubai, Dubai International Financial Centre (DIFC), and Dubai International Airport.
Amenities
The development is equipped with a comprehensive range of amenities designed for wellness, leisure, and community engagement:
Grand, light-filled lobby
Canopy Forest and Cascading Terraces
Pool Podium and Sky Pool
Fitness Studio and a private spa with saunas and steam rooms
Co-working Area with sea views
Kids Club, Kids Pool, and Outdoor Kids Play Area
Multi-purpose Pavilion and Room
Outdoor Seating Areas
Read more
Kanyon by Beyond Price and Unit Size
1 Bedroom Apartments
Sold Out
2 Bedrooms
Size: 1,350 sqft (125.42 m²)
Price: 3,799,000 AED (1,040,822 USD)
3 Bedrooms
Size: 2,402 sqft (223.15 m²)
Price: 7,588,000 AED (2,078,904 USD)
Please note; unit availability changes daily. Contact us for the most recent inventory.
Kanyon by Beyond Payment Plan
The payment structure for the project is as follows:
10% On Booking
40% During Construction
50% Upon Handover
LOCATION
Madinat Dubai Al Melaheyah, Dubai, Dubai, United Arab Emirates